Sign In | Join Free | My enlightcorp.com
enlightcorp.com
FOSHAN PHRESH NEW MATERIAL TECHNOLOGY CO., LTD
FOSHAN PHRESH NEW MATERIAL TECHNOLOGY CO., LTD The company regards safety, health and environmental protection as one of the important values!
Home > Quick Drying Metal Primer >

Anti Corrosion Quick Drying Metal Primer Alkyd Water Based Liquid Coating

FOSHAN PHRESH NEW MATERIAL TECHNOLOGY CO., LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment

Anti Corrosion Quick Drying Metal Primer Alkyd Water Based Liquid Coating

Place of Origin : FoShan China
Brand Name : Trade Paints
Model Number : PHRESH-8011
Certification : ISO SGS NQA ROHS
MOQ : Negotiable
Price : Negotiable
Payment Terms : 7days Western Union, T/T, L/C, MoneyGram
Packaging Details : 4.8KG,5KG,10KG,25KG
Main Raw Material : Alkyd
State : Liquid Coating
Application Method : Brush | Roller | Spray
Dry film thichness : 60µm
Wet film thickness : 120µm
Delivery Time : 7 days
Supply Ability : 10000KGS/DAY
Contact Now

Anti Corrosion Quick Drying Metal Primer Alkyd Water Based Liquid Coating


Product descriotion

This product consists of epoxy resin,zinc powder,pigments and additives composed of two-component anti-rust primer,with excellent corrosion resistance.

Features

With cathodic protection,excellent rust resistance

Excellent adhesion on sandblasted steel

Has a good welding performance

Has good water resistance,oil resistance and solvent resistance

Dry and fast,with good construction performance

Scope of application

It can be applied to the painting of steel structures,storage tanks,bridges,etc.It can also be used for anti-corrosion coating of chemical plants,chemical fertilizer plants,power plants,oil refineries,paper mills and sewage treatment plants.

Basic paramerers

Specific weight:about 0.85kg/L

Dry film thichness:60µm

Wet film thickness:120µm

Theoretical dosage:150/㎡

Formulation:Part A:Drier:Water=10:1:1(weight ratio)

Drying time:(25℃)Dry≤th Dry≤24h Completely dry 7 d

Curing time :(20℃)30min

Applicable period:(20℃)5h


Drying time:

Temperature of basis material5℃23℃30℃
Touch dry4 hours3 hours1 hours
Repainting interval (Min)12 hours6 hours4 hours
Flooding time from the application of the last coat(Min)24 hours at 5℃ up to 22℃ and 12 hours
over of 23℃
Repainting interval (Max)Less than 1 hour from totally dry of paint
film to flooding, vary according to environment conditions.

Precautions

1. Thoroughly stir the B component thoroughly before use,and mix the A and B components by mixing until they are ready for use.

2. During the construction of high temperature season,dry spraying is easy to occur.To prevent the dry spray phenomenon from occurring,special thinner must be added to adjust the dry spraying.

3. Before coating after coating,must completely remove the surface of zinc salt to prevent affecting the paint film adhesion.

4. The paint storage ventilation,cool,dry place,the construction site should strengthen the ventilation exhaust.


Notes

1. The data, usage, and recommendations of the above products are based on experimental and actual use experience and are only used as a construction reference.

2. For the construction that we cannot meet the situation,our company only guarantees the quality of paint products.

If there is any change in the above data,the latest information of the company shall prevail.No further notice will be given.


Product Tags:

quick drying metal paint

      

quick drying exterior paint

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

Anti Corrosion Quick Drying Metal Primer Alkyd Water Based Liquid Coating Images

Inquiry Cart 0
Send your message to this supplier
 
From:
To: FOSHAN PHRESH NEW MATERIAL TECHNOLOGY CO., LTD
Subject:
Message:
Characters Remaining: (0/3000)